Millarville Embankment Protection Project

 

 

Millarville is a hamlet in Alberta, Canada within the Municipal District of Foothills No. 31. It is located 50 KM southwest of Calgary in the foothills of the Canadian Rockies at an elevation of 1,185 metres. 

Every year the embankment of the Sheep River floods and requires consistent annual repairs.  The concern was for severe erosion damage and the region wanted a permanent solution. Calgary engineering firm Amec Foster Wheeler completed the design which recommended the use of Futerra® TRM from Profile Products. The installation covered 3,700 m2  and ultilized 3' soil Gripple anchors to secure it in place.

 

BW Products Used: Profile Products Futerra® R45 HP TRM with 3' soil Gripple Anchors

Project Completed: Spring 2017

Location: Millarville, AB

Engineer: Amec Foster Wheeler, Calgary, AB

Installer: Farmboys Landscaping & Maintenance, High River, AB

Brock White Sales Representative: Jeremy Whalen

 


 

Gripple Anchors secured the grid

Project Designed by Amec Foster Wheeler of Calgary, AB

Anchors driven into the ground using a Hilti Drill


 

Four weeks later

Four weeks Later

About Futerra® TRM

This high performance TRM was developed for extreme slopes and critical structures on challenging sites where extreme flows are anticipated. Enhanced UV stability and very high tensile properties provide heightened durability for severe environmental conditions and resistance to wheel loading from maintenance equipment.

Futerra® TRM Data Sheet

Futerra® TRM Brochure